// technical guide: compliance

Navigating the QD378-EVN Standards

MAR 12, 2025 // REGULATORY COMPLIANCE UNIT
Industrial Compliance Dashboard

Understanding the latest grid-connection requirements for self-consumption solar power (ĐMTMN). We break down Decision No. 378/QD-EVN (2025) and Circular 46/2025/TT-BCT.

A. Connection & Monitoring Requirements

Data Transmission

  • • Real-time Power (P): Min 5 min cycle
  • • Daily Energy (A): 1 time / day
  • • Inverter Config Management

Data Storage

  • • History: Min 7 days storage
  • • Resolution: 5 minute increments
  • • Reliability: Local backup + Auto-sync

⚠️ Non-export systems: No remote control (SetPoint) required from EVN dispatch centers.

B. Protocols & Security

Protocol Default Port Notes
Modbus TCP 502 IP/Subnet provided by EVN
IEC 60870-5-104 2404 Standardized grid telemetry

// Security: TLS Encryption or OpenVPN/IPSec tunnel mandated.

C. Signal Mapping (Mandatory)

Signal Name IEC 104 Addr Modbus Addr
P-out (Grid Power) T13 - Addr 1 T04 - Addr 1
Pinv-out (Total Inv) T13 - Addr 2 T04 - Addr 3
Ainv_D-1 (Prev Day Energy) T13 - Addr 3 T04 - Addr 5

C+. Recommended Signals (To Addr 11)

Signal IEC 104 Modbus
kVAr (Reactive Power)T13 - Addr 4T04 - Addr 7
Voltage (Ua, Ub, Uc)Addr 5, 6, 7Addr 9, 11, 13
Current (Ia, Ib, Ic)Addr 8, 9, 10Addr 15, 17, 19
Frequency (Hz)T13 - Addr 11T04 - Addr 21

D. Metering & Connection

Commercial meter systems must follow **Circular 05/2025/TT-BCT** (Feb 1, 2025). Meters must be on EVN's approved list and compatible with the centralized data collection system (HES).

E. Network Infrastructure

Speed
≥ 64 kbps
Latency
≤ 125 ms
Types
4G/5G, Internet, RF